Wednesday, 28 May 2025

Future prospects for SEA AIR shipments via India

The future prospects for sea and air shipments involve continued growth in global trade, technological advancements, and increasing focus on sustainability and customer-centric solutions. 

Sea-air shipments are a part of India's multimodal logistics ecosystem, though they are less common than standard sea or air shipments. Sea-air shipment is a logistics model where cargo is first transported by sea freight (often from origin countries to transshipment hubs like Dubai, Singapore, or Colombo), and then by air freight to the final destination—or vice versa. In India, some ports and airports support this model to optimize cost and transit time.


---

✅ Current Status of Sea-Air Shipments in India

While not widely mainstream, sea-air multimodal shipments do occur via:

Major Indian ports like Nhava Sheva (JNPT), Chennai, Mundra, and Kolkata

International airports like Mumbai (BOM), Delhi (DEL), Chennai (MAA), and Bangalore (BLR)


However, many sea-air operations related to Indian cargo are routed through foreign transshipment hubs due to better infrastructure, fewer delays, and faster processing times.


---

๐Ÿ‡ฎ๐Ÿ‡ณ Indian Customs Procedures for Sea-Air Shipments

India doesn’t have a specific, distinct customs code just for sea-air shipments; they fall under multimodal transport or transshipment cargo. However, the process typically involves:

1. Multimodal Transport Declaration (MTD)

The operator (or freight forwarder) must be registered as a Multimodal Transport Operator (MTO) with the Director General of Shipping.

The MTO issues a Multimodal Transport Document, used for customs and logistics tracking.


2. Customs Clearance Stages

Stage 1: Sea Arrival

Cargo arrives at a seaport (e.g., Nhava Sheva).

Customs filing: Bill of Entry (BOE) for imports or Shipping Bill (SB) for exports is submitted on the ICEGATE portal.

Clearance is done or cargo is moved under bonded transit if transshipment is required.


Stage 2: Transfer to Airport

Goods are moved from port to airport under bonded trucking, facilitated via Inland Container Depots (ICDs) or Container Freight Stations (CFS).

Customs supervision or bonded carrier rules apply (with documentation and bond guarantees).


Stage 3: Air Departure

At the airport, export cargo is re-submitted to customs for inspection (if required) and air shipment procedures are completed.

If it's import cargo arriving by air and moving to port by sea, the process is reversed.



3. Key Documents Required

Multimodal Transport Document (MTD)

Bill of Entry or Shipping Bill

Invoice, Packing List

Insurance Certificate

Bonded Transport Declaration (if under bond)

Airway Bill (AWB) and Bill of Lading (BL)

Importer Exporter Code (IEC)



---

๐Ÿšง Challenges in India for Sea-Air Shipments

Lack of synchronized sea-air corridors like those in Dubai or Singapore.

Delays due to bureaucracy at multiple clearance points.

Limited infrastructure integration between ports and airports.

Manual intervention and dependency on bonded trucking/logistics providers.



---

✅ Suggestions to Facilitate Sea-Air Shipments in India

Choose well-established Multimodal Transport Operators (MTOs).

Use ICDs near major ports with good road connectivity to airports.

Work with customs brokers familiar with multimodal and bonded procedures.

Ensure all documentation is digitally submitted via ICEGATE and DGFT platforms.



---

If you’re planning a shipment and want help with the best sea-air route or customs clearance agent recommendations, I can help further—just share the origin, destination, and type of cargo.


No comments:

Post a Comment

Note: only a member of this blog may post a comment.